Communication Networks
Fortel's Communication Networks Division offers a range of possible solutions and
methods in order to meet the client's requirements. Our flexible packages ensure
that the client satisfaction is met on every project.
Completed Projects
Current/Upcoming Projects
Typical Construction Sequence
- Regular Base size
- 10 Metre - Long
- 1.5 Metre - High
- 1.5 Metre - Wide
- Resources to excavation area
- Mark-up excavation area
- Obtain Excavation Permit
- Obtain drawings/details for base and buried cables
- Mark-up services and cables
- Hand-dig, locate cables and services
- Tippers remove excess
- Supervisor ensures all areas secured and made safe at end of day
- Compact ground once excavation depth reached
- Have area inspected
- Blinding placed
- Steel & shuttering fixed and placed
- Ducting inserted
- Set, level & cover bolt clusters
- Pour & finish concrete
- Shuttering stripped, bolts uncovered; black jack applied
- Area back-filled and top soil spread
Services also available:
- Catchpit building for ducting
- Base or plinths for signal columns
- Construction works for Highways Agency such as pathways to control boxes and steps
for walkway to top of batter etc
- Main loop connection ducting installation to connect all gantries
- Supply:
- All 8 Wheelers/Lorries
- Type 1 and other aggregates
- Top Soil
- Concrete
- Pumps
- Plant
- Removal and disposal of excavated material
|